Industries · Gas Utilities

Gas distribution operations intelligence. Built for LDCs.

Continuously-calibrated hydraulic models, risk-ranked distribution work, OQ-enforced dispatch, and DIMP / Part 192 compliance workflows.

The LDC reality

The problems gas utilities are trying to solve.

Designed for the LDC that needs operational intelligence on top of their existing hydraulic modeling, work management, and GIS stack.

Distribution hydraulic models that drift in months

The problem:Customer additions, main replacements, regulator changes, network reality shifts constantly. A hand-built hydraulic model is calibrated to the network as it stood on the day it was built, and it erodes from there as the network moves on. Decisions get made against stale data.

With WorkSync:Continuously-calibrated distribution network models. Auto-built from GIS + SCADA + regulator data.

Leak-survey work queued by date, not by risk

The problem:Federal Part 192 survey cycles drive the schedule, but not all leak candidates are equal. A Grade-1 near-school candidate and a Grade-3 rural candidate compete for the same crew-day on a date-ordered queue.

With WorkSync:Leak candidates scored by risk-adjusted priority (Part 192 grade × proximity × customer count). PMs compete on the same ranked list.

Crew qualifications tracked separately from dispatch

The problem:Fuser certifications, operator qualifications (OQs), and contractor competency live in HR or a compliance system. Dispatch happens in a separate tool. Reconciliation is end-of-quarter, audit failures are retrospective.

With WorkSync:OQs + qualifications + priority in one optimization.

Capacity planning that can't match DSM reality

The problem:Demand-side management and electrification are changing load curves faster than planning cycles can keep up. Hydraulic studies done every 3-5 years miss the trajectory.

With WorkSync:Weeks of manual build effort compress to minutes per model (deployment account).

The WorkSync gas-utility stack

Modules built for distribution operations.

FlowSync automates the hydraulic work your planning engineers used to do by hand. OPS modules run the daily execution loop across every distribution crew.
  • FlowSync

    Continuously-calibrated distribution network models. Auto-built from GIS + SCADA + regulator data. Native Synergi, EPANET, and WaterGEMS export. Weeks of manual build effort compress to minutes per model (deployment account).

    See FlowSync for Distribution →

  • Work Engine

    Ranked daily work for distribution crews. Leak candidates scored by risk-adjusted priority (Part 192 grade × proximity × customer count). PMs compete on the same ranked list.

    Work Engine →

  • Route Optimization

    Multi-stop dispatch for distribution crews, leak survey, meter change-out, regulator maintenance, customer calls. OQs + qualifications + priority in one optimization.

    Route Optimization →

A gas district regulator station: a yellow marker post, a regulator and a bollard frame on gravel, with a loader in the background
A gas district regulator station · Photo: Tony Webster, CC BY 2.0

Frequently asked

Questions LDC teams ask

Which other modules run for distribution crews?
  • Field SafetyLone-worker monitoring for leak survey and emergency response crews. Gas-detection integration, OQ tracking enforced at dispatch, DIMP compliance workflows.
  • Work Order ManagementField-native CMMS for distribution assets. Mobile offline capture for leak grades, pressure readings, photos. Syncs to compliance systems + DIMP reporting.
  • Field Data CaptureOffline-first mobile for leak classification, customer-premise visits, meter change-outs. Replaces paper forms and after-shift Excel re-keying.
What does it run on top of?

Runs on top of your LDC stack

Distribution + GIS

  • DNV Synergi
  • AVEVA WaterGEMS
  • EPANET
  • Esri ArcGIS

SCADA + Operations

  • Ignition
  • AVEVA PI
  • Honeywell Experion
  • Yokogawa

Compliance + OQ

  • ITS (OQ)
  • NGA / AGA frameworks
  • DIMP workflows
  • Part 192 reporting

See all 39 integrations 

See the LDC stack on your distribution data.

A FlowSync model for one pressure zone, calibrated against your SCADA within 2 weeks. No rip-and-replace.