Operating system for oil & gas operations

Production-ops use cases. Three solutions. One ranked work loop.

WorkSync rolls every production-operations workflow up into three outcome-led solutions. Land in any department. Prove the ROI on one field. Expand across the operation.

4-week pilot on one field · deploys on your existing stack · no rip-and-replace

The Three Solutions

Three outcome-led solutions. Land in one. Expand into the rest.

Each solution is a complete entry path with its own buyer, lead product, and proof. The use cases below are organized as evidence under whichever solution they belong to.
  • Solution 1 · Work Engine

    Work Execution

    Ops, maintenance, regulatory, environmental: far more effective. One ranked work loop, scored by cash flow and risk.

    Primary buyer
    VP Operations · Field Superintendent
    Outcome
    15% FCF uplift · 35% fewer miles driven · 5,000+ wells covered (deployment figures)
    Use cases under this solution
    14 workflows
  • Solution 2 · Field Safety

    Field Safety

    HSE teams far more effective. Every worker home, every shift. Situational awareness replaces hardware-only lone worker.

    Primary buyer
    HSE Director · HSE Manager
    Outcome
    Unsafe dispatch blocked before the truck rolls · contractor competency at scale
    Use cases under this solution
    2 workflows
  • Solution 3 · FlowSync

    Engineering & Back-Office Automation

    Much faster. Zero duplicate data entry. Agentic work delivered inside the tools your teams already use: your simulators, production accounting, and ERP.

    Primary buyer
    VP Engineering · Controller · Land & Legal
    Outcome
    Engineers stop doing data entry · weeks → minutes on model builds
    Use cases under this solution
    6 workflows

Buyers who arrive by budget line rather than by outcome usually start at upstream maintenance and work orders or at the operations center, and meet the same ranked plan underneath either one.

The backbone is the enabling layer. DataHub (included foundation), Workflow Automation, and the AI Assistant run under every solution. You don’t buy them separately, we deliver them with whichever solution you land first.

A pig launcher with a spoked quick-opening closure, barrel, eccentric reducer, kicker line and launcher valve on a concrete plinth, under a deep blue sky
Pig launcher, quick-opening closure and crude-oil line · Photograph

The Evidence

Specific workflows our customers actually run.

Each use case names the persona, the trigger, the modules in order, and the quantified outcome. Tagged by which solution it belongs to and which vertical it serves.
Replace fixed pumper routes with a 6 AM ranked plan

Upstream#1

PersonaLease Pumper / Field Super (managing 18 pumpers, 600+ wells)

Trigger6 AM Tuesday. Prices moved $4 overnight. Three wells alarmed. Fixed routes don’t know.

OutcomeSame crew, production issues seen sooner, fewer empty miles. Large independents have built internal teams for exactly this role.

  • Work Engine
  • Route Optimization
  • Field Data Capture
Don’t visit me unless I need attention: Pump by Exception

Upstream#2

PersonaField Superintendent

TriggerContinuous SCADA stream

Outcome35% fewer miles driven (deployment figure)

  • Anomaly Detection
  • Pump by Exception
  • Reinforcement Learning
Choke schedule re-ranks when commodity prices move

Upstream#3

PersonaProduction Engineer

TriggerMaterial WTI / Henry Hub / NGL basis move

OutcomeThe choke schedule follows the price deck without an engineer re-running the model

  • Price Signals
  • Economic Scoring
  • Work Engine
Predict compressor failure 48–72 hours out, schedule the fix

Cross-vertical#4

PersonaReliability Engineer

TriggerVibration + temperature trend deviation

OutcomeFewer unplanned compressor outages, caught days early instead of hours late

  • Predictive Maintenance
  • Economic Scoring
  • Route Optimization
Dynacard anomaly → ranked rod-pump intervention

Upstream#6

PersonaPumper + Production Engineer

TriggerDynacard shape deviation (gas lock, pump-off, rod parts)

OutcomeMean-time-to-intervention drops from days to hours · recoverable bbl/day captured

  • Anomaly Detection
  • Economic Scoring
  • Route Optimization
Pigging campaign sequenced by PHMSA integrity priority, not geography

Midstream#9

PersonaPipeline Integrity Engineer

TriggerAnnual ILI / cleaning campaign plan

Outcome49 CFR 192/195 coverage with measurable shift to higher-risk segments

  • Anomaly Detection
  • Economic Scoring
  • Work Engine
  • FlowSync
Cascading compressor-station alarms ranked by economic & safety impact

Midstream#10

PersonaControl Room Operator + Field Foreman

TriggerMulti-alarm event at a station

OutcomeCascading alarms triaged into one ranked dispatch instead of a manual sort under pressure

  • Data QA
  • Anomaly Detection
  • Economic Scoring
  • Field Safety
Right-of-way patrol prioritized by integrity-management risk, not mileage

Midstream#12

PersonaPipeline Patroller / ROW Coordinator

TriggerClass-location review, weather event, encroachment alert

Outcome49 CFR 192.705 patrol intervals satisfied with attention shifted to high-risk segments

  • Anomaly Detection
  • Route Optimization
  • Pump by Exception
811 one-call locate dispatched to a qualified locator with SLA awareness

Gas Utility#13

PersonaLocator / Damage-Prevention Dispatcher

Trigger811 ticket arrives via state one-call center

OutcomeDig-in damage rate reduction; each avoided event averts roughly $150K in societal cost on CGA DIRT averages

  • Work Engine
  • Route Optimization
  • Field Safety
  • Field Data Capture
DIMP / leak-survey 49 CFR 192 cycle with risk-prioritized re-survey

Gas Utility#14

PersonaLeak Survey Tech + Distribution Integrity Manager

TriggerCycle window per 49 CFR 192 Subpart P (DIMP)

OutcomeCycle compliance retained · tech-hours concentrated on streets driving system leak rate

  • Anomaly Detection
  • Pump by Exception
  • Route Optimization
Cathodic-protection reads: only revisit drift outliers

Gas Utility#15

PersonaCorrosion Tech / CP Specialist

TriggerAnnual / quarterly CP test-station read cycle

Outcome49 CFR 192.465 / NACE SP0169 coverage maintained · CP-tech hours concentrated on drift outliers

  • Anomaly Detection
  • Route Optimization
  • Pump by Exception
Intercept 3rd-party downtime before it costs production

Cross-vertical#18

PersonaProduction Engineer + Field Foreman

TriggerRental-equipment anomaly OR midstream takeaway constraint

OutcomeEmergency rental swaps replaced by scheduled · midstream blockage caught in hours

  • Anomaly Detection
  • Economic Scoring
  • Work Engine
  • Price Signals
Codify retiring-pumper tribal knowledge into the daily plan

Cross-vertical#22

PersonaVP Operations + Field Superintendent (12% of workforce under 30, average 56)

TriggerA senior pumper / operator with 30 years on a route announces retirement. Engineering roles are the hardest to fill; tribal knowledge is a balance-sheet liability.

OutcomeNew-hire ramp cut from months to weeks. Preserves judgment that would otherwise walk out the door.

  • Work Engine
  • DataHub
  • FlowSync
  • Reinforcement Learning
Produced-water intensity & disposal optimization (Permian-acute)

Upstream#23

PersonaProduction Engineer + VP Operations

TriggerDisposal already 25% of LOE in some Permian operators. Permian water at ~20 MMbbl/d in 2025, projected 26+ MMbbl/d by 2030. Trucking ~$2.50/bbl vs pipe ~$0.30/bbl.

OutcomeWater-handling LOE (the largest single LOE category for many Permian operators) attacked directly · avoids forced shut-ins when SWDs hit pressure caps

  • DataHub
  • Work Engine
  • Route Optimization
  • Anomaly Detection

Sourced from recent public operator IR (Devon, EOG, Continental, ConocoPhillips) and live WorkSync deployments.

Frequently asked

What operators ask before picking a use case.

What are WorkSync's three solutions?

Work Execution (Work Engine lead, VP Ops / Field Superintendent buyer), Field Safety (HSE Director buyer), and Engineering & Back-Office Automation (FlowSync lead, VP Engineering / Controller buyer). Each solution is a complete entry path with its own buyer, lead product, and proof.

The use cases on this page are organized as evidence under whichever solution they belong to.

How many use cases does WorkSync support?

The platform powers production-operations workflows across all three solutions.

Coverage spans upstream (pumper ranked plans, pump by exception, dynacard rod-pump intervention, compressor predictive maintenance, LDAR routing, methane super-emitter response, produced-water optimization), midstream (PHMSA-priority pigging, compressor alarm cascades, hydraulic refresh, ROW patrol), gas utility (811 one-call dispatch, DIMP risk-prioritized leak survey, cathodic-protection drift detection), and cross-vertical workflows (LOE/BOE dashboards, M&A asset integration, capital-allocation cohort dashboards, pre-close due-diligence audit, workforce knowledge codification, third-party uptime intercept).

The catalog grows as operator priorities evolve.

Where do I start?

Land with DataHub read-only, which touches nothing in your systems of record, or start with a single FlowSync model engagement.

Either one starts as four weeks on one field and expands across the platform from there, scoped to your well count and systems with our implementation team when you plan your pilot. Under the Impact Guarantee, license fees only when the metrics move.

What does "ranked work loop" mean?

Every task across your asset base is scored by economic impact (dollars at risk × probability × downside risk) and risk (hazard profile × crew competency × exposure). The combined score drives dispatch. Cash flow objectives never override safety.

Safety is a hard constraint in the optimizer, not a weight. Plans are continuously re-ranked as conditions, prices, and SCADA signals change.

Does WorkSync replace my existing systems?

No. WorkSync sits on top of the SCADA, ERP, CMMS, and GIS systems you already run (Enertia, Quorum, Peloton, Maximo, Oildex, AVEVA PI, Ignition, Cygnet, eLynX, IFS Merrick, and 30+ others). Read-only first; write-back is configurable per your governance. Zero rip-and-replace.

How operators keep up with the AI adopters

Pick the use case that hurts the most this quarter. Land there. Expand from there.

Four weeks to stand up under the Impact Guarantee, license fees only when the metrics move. Then you run it for three-plus months and let the number prove itself.

Reply within 1 business day · 4-week pilot · license fees only when the metrics move

It sits on top of the SCADA, ERP, CMMS, and GIS systems you already own.

Show Me My NumberPlan Your Pilot