For operators at scale
Built to pass your diligence. Priced to skip the committee.
Security posture, integration depth, and a pilot model your procurement team won’t fight. Everything your digital and IT organization needs to shortlist WorkSync, on one page.
CMMS + Prioritization Engine + Work Management + Field Data Capture + Accruals, one platform · Secure by design · Field-tested on 5,000+ wells in live deployments
Live in 4 weeks · 39 systems already connected, 15 industrial protocols · License fees only when the metrics move
Grow production without growing headcount.
Instead of deploying multiple tools, deploy one platform that drives results.
The WorkSync operating thesisLarge operators don’t buy promises; they buy diligence-ready vendors. This page exists so your digital team, your IT security office, and your supply chain organization can qualify WorkSync without a meeting.
The short version: one platform (CMMS, Prioritization Engine, Work Management, Field Data Capture, and Accruals) that reads from the systems you already run, deploys in four weeks, starts as a read-only one-field pilot, and carries license fees only when the metrics move.
The question that matters is not how few people you can run with, it is where the next person goes and when you will actually need them.
Headless by design: every flag, score, rank, and route is available over an API, so your analysts consume the ranking in the tools they already built. The interface is for the field.
What operators get. In this order.
RESULT #1
Downtime Reduction
Down wells and failing lift get found, priced, and worked first. Deferment stops compounding quietly.
RESULT #2
Optimal Liquid Management
Fluid levels, tank capacity, and hauling are managed against value, not against yesterday's route sheet.
RESULT #3
Proactive Risk Management
Safety and integrity risk is scored into every job's priority, so the riskiest work never waits at the back of the queue.
RESULT #4
The Full Picture of Value Sinks
Production losses and cost surprises show up in one ledger: you see where value leaks before it hits the month-end close.
How WorkSync fits in
Your systems
- SCADA & alarms
- Lift optimization & surveillance
- ERP & production accounting
- Historians & PM schedules
WorkSync
- Flag: issues & preventative maintenance
- Price & prioritize: AI ranks by $ and risk
- Route: routeless dispatch to the right crew
- Close: ticket, accrual, downtime recovered
Your field team
- Lease Operators
- Technicians
- Roustabout Crews
- Mechanics & Electricians
The support that keeps your field equipment running, driven by one ranked queue, with a UX field teams love: built for the cab, offline-capable, and held to a design standard of under 20 minutes a day of software per field team member.
WorkSync reads from your existing systems and closes the loop with your field team. Scope is work management: flagging, prioritizing, routing, and closing out field work. Telemetry and remote control keep their existing route.
Your systems
- SCADA & alarm systems
- Historians
- Lift optimization tools
- ERP & production accounting
WellOPS platform
- DataHub: unified operational dataset
- Prioritization Engine
- CMMS + Work Management
- Field Data Capture
- Accruals
Your people
- Remote operations center
- Field crews (mobile, offline-capable)
- Production engineering
- Finance / accounting


Security & deployment
- Security & compliance
- Secure by design · SSO via SAML/OIDC · role-based access control · encryption in transit and at rest · audit logging · full security posture
- Integrations
- Pre-built connectors for common SCADA, historian, ERP, production accounting, and lift-optimization stacks (AVEVA PI System, SAP, Oracle, Enverus, WolfePak, Quorum, XSPOC, and more) · full connector list
- Deployment
- Cloud-hosted: single-tenant, customer-VPC, and on-prem edge options (full detail on the security page) · read-only integration mode for pilots · deployment architecture reviewed with your IT security office during scoping
- Scale
- Field-tested across 5,000+ wells in live deployments · multi-basin, multi-entity
- Implementation
- 4 weeks from kickoff to live · no rip-and-replace · stood up by a team that has done it before
- Commercial
- One-field pilot · Impact Guarantee: license fees only when the metrics move · commercial terms scoped with our implementation team
- Procurement
- Standard MSA · security documentation available for review before a pilot · references available under NDA
- The pilot is scoped to one field for four weeks, not to an enterprise program
- Pilot runs read-only against your systems; writes begin only when you promote it
- Every number the platform shows traces to a source system record
The case for acting this year rather than next rests on conditions outside WorkSync: bandwidth reaching remote sites, the collapse in the cost of inference, and speech recognition becoming commodity infrastructure. Each one is set out, dated, and cited on why now.

Before you buy
The two questions that stall an evaluation after security clears.
How do we justify this internally?
Build the case from a method rather than a projection. First, you and your controller pick one operating metric and write it down before anything is connected: cash flow per BOE, operating cost per well, drive miles, or TRIR.
Second, run your own well count, crew count, and drive times through the route economics calculator on this site, which puts a dollar figure on a day of your field capacity using your inputs rather than ours.
Third, run the four-week pilot on one field against that single agreed metric, with the baseline set in week zero, so the business case is measured on your wells.
The Impact Guarantee carries the commercial risk while that happens: license fees only when the metrics move. What reaches your approver is your own baseline and your own delta, which is the only version of the number that survives a finance review.
What training does the field need before the first shift?
The app is built for a truck cab at 6 AM in gloves: one screen at a time, offline capable, and it syncs when signal returns.
A field team member opens it to a day that is already assembled and already in order, so the first shift is the training.
Capture happens at the wellhead, by voice or in a couple of taps, rather than at shift end, and Willie walks a person through a JSA by voice.
Every stop carries the reason it is ranked where it is, and any stop can be resequenced or skipped in one tap with a reason code, which keeps local knowledge in charge of the day.
The rollout is gated rather than dated: flags tune against the field's own judgment first, and the ranked plan goes into a truck when the crews agree the ranking is right.
The measure that matters is whether the plan survives contact with the field, and establishing that on your own crews is what the four weeks are for.
See your wells, ranked by dollars, tomorrow morning.
Bring one field’s data. We’ll show you the ranked plan your crew would have run today, and what it was worth.