A program that survives a regulator reading it.
Leak detection programs fail in two directions. Tune for sensitivity and the control room drowns in false alarms. Tune for quiet and the program cannot defend its own number. Both failures come from the same gap.
For Integrity Manager, VP Midstream
Objective 02 on the WorkSync Services list
- The objective
- Stand up leak detection or integrity management
- Who owns it
- Integrity Manager, VP Midstream
- The first yes
- A readiness read on one system, against the rule it is judged by.
- How it starts
- A 2 to 4 week assessment. Fixed fee, defined scope.
Who this is for
Stand up leak detection or integrity management
A regulatory deadline, a new rule, an audit finding, a release, or an acquisition that brought pipe with it.
It is rarely the only objective on the owner’s year, which is why the assessment prices one asset group rather than the estate.
What we hear
- We need a leak detection program that will survive a regulator reading it.
- Integrity is a binder, a consultant and a deadline.

What we do
Discover, Align, Capture.
Discover
Read it as it runs
What is measured now, what the rule actually requires, and the gap between them.
Align
Decide once, together
The program written, and the detection designed around the instrumentation you have, not the instrumentation a vendor would sell you.
Capture
Keep it honest
The evidence trail the regulator asks for, produced by running the system rather than by an annual scramble.
We are not here to replace your stack. Most of what we have delivered runs on systems you already own. We add software only where it improves the operating model.
What is on the record
Founder experience. Three pipeline operators, and a top 25 private producer
- 0.5%On a crude oil pipeline, detection sensitivity driven below 0.5% of flow within 24 hours.Founder experience: work led by a WorkSync founder in prior operator roles
- $32MMAt a midstream pipeline operator, an API RP 1175 program run across control center, integrity, hydraulics and SCADA on a risk model weighing measured performance and management practices: $32MM of capital redirected, $15MM of low value projects cancelled.Founder experience: work led by a WorkSync founder in prior operator roles
At a third pipeline operator, the leak detection strategy and the measurement manual.
For a top 25 private producer, integrity and leak detection response on a common risk basis.
Founder experience: work led by a WorkSync founder in prior operator roles
Emissions leak surveys are a separate, delivered capability: our software schedules each survey against the federal rule that requires it. Tightening sensitivity alone is easy. Holding false alarms down while you do it takes engineering.
What you get
Everything here is yours to keep and yours to run.
What you keep · Objective 02
- API RP 1149 leak detection performance analysisFOUNDER EXPERIENCE
- Leak detection program design to API RP 1175FOUNDER EXPERIENCE
- SPCC planFOUNDER EXPERIENCE
- Integrity management program frameworkFOUNDER EXPERIENCE
- Batch trackingFOUNDER EXPERIENCE
- Leak detection risk ranking and capital planFOUNDER EXPERIENCE
- DELIVERED
- We built it for a client and handed it over.
- FOUNDER EXPERIENCE
- A founder led it inside an operator, in an operator role.
- RUNS TODAY
- Live in our software.
- WITH YOUR TEAM
- We have the components and the people, this exact thing would be a first, and we say so.
Where we fit
And where we do not, said before you ask.
A fit
Not yet
Codes and scope
Written against the rule you are judged by.
Scoped to your system: API RP 1130 and 1175 under 49 CFR 195.444 on liquids; on gas, 192.706 leakage surveys and the PHMSA leak detection and repair rulemaking as it stands when your program is written.
Integrity to 49 CFR 195.452 for liquids segments that could affect a high consequence area, 192 subpart O for gas transmission, 192.9 for regulated gathering. SPCC is EPA 40 CFR 112 and belongs to the facility side.
Leak detection is a monitoring and alarm function, not a safety instrumented function.
Take it with you
- Case study 02, Leak Detection and ModelingPDF, one page
- Objective 02, Stand up leak detection or integrity managementPDF, one page
No gate. Nothing to fill in first
The rest of the practice
- OperationsField operationsEfficiency, downtime and artificial lift: the work the crews do every day, chosen by what it is worth.
- Engineering and SafetySafety programA safety management system the field owns: hazards assessed with the crew, competency per task, leading indicators.
- Engineering and SafetyEngineering capacityRecurring engineering deliverables drafted from your own data, so the engineer reviews and issues instead of gathering.
- Technology, Data and AIOperational dataThe integration inventory, one canonical model, governed tables in your own cloud, and the runbook to own them.
- MethodWhat an engagement looks likeThe four phases, what we do, what your team does, and what lands at the end of each one.
How it starts
Start with a 2 to 4 week assessment.
A readiness read on one system, against the rule it is judged by.
Send us one asset group and the objective you are judged on. The Assess stage puts a dollar figure on it in two to four weeks, for a fixed fee. You keep the number either way.