The hydraulic model that used to take 200 hoursre-tunes in 20 minutes.
Five agents. One Golden Record. Integrity, dispatch, leak investigation, and M&A integration on a single operational substrate. The agentic engineering stack purpose-built for gathering, transmission, and storage operators who already own their hydraulic and integrity tools and need them to keep up.
The bottleneck is not the model. It is the hours of expert time before the model can run.
A modern hydraulic transient simulation, an ILI re-assessment, an MAOP recalculation, a leak-survey route, an HCA exposure study — these are all combinatorial problems with a regulator on the other end. The math itself is solved. What kills the cycle time is the data preparation: pulling SCADA, reconciling against GIS, normalising units, finding the last validated tie-in survey, re-running the model, then exporting an OQ-traceable record.
Agentic AI does not replace the engineer. It collapses the prep-and-export tail. The engineer reviews, signs, and moves on to the next decision. The compliance evidence falls out as a by-product, time-stamped and version-controlled.
Five midstream agents on one Golden Record
Each agent runs against a single reconciled data substrate so the integrity engineer, the dispatcher, and the controls lead are all looking at the same numbers. Pick one, expand later.
Hydraulic Twin Agent
Re-tunes steady-state and transient models against live SCADA in minutes, not weeks. Surfaces drift, identifies the most-likely sensor or segment cause, and writes back a candidate calibration for the engineer to approve.
Integrity Agent
ILI re-assessment, corrosion-growth modelling, and HCA exposure scoring. Re-prioritises dig lists when a new run lands. Pulls forward the digs that move risk most per dollar.
Compliance Agent
Generates the audit trail as a by-product, not a separate workstream. PHMSA Part 192 / 195, OQ qualifications, MAOP recalculations, change-of-service. The regulator reads the same record the engineer signs.
Dispatch + Control Agent
Outage-impact ranking, leak-survey routing, valve-isolation playbooks. Ties dispatch decisions to integrity state and HCA exposure, not just shortest distance.
M&A Integration Agent
Maps a target system into your Golden Record in days. Reconciles units, asset hierarchies, and historian tags. Closes the gap between deal close and operational control.
FlowSync · Golden Record
The substrate every agent runs on. Reconciles SCADA, historians, GIS, ILI, ERP, and study files into one versioned operational truth. GitHub-for-studies for the engineering team.
HCA, OQ, PHMSA — written as you work, not bolted on at audit
Every model run, every dig prioritisation, every dispatch decision lands in a tamper-evident record with the inputs, the model version, the engineer who signed, and the regulator-ready export. When the next PHMSA audit lands, the answer is a permalink.
- • Part 192 / 195 evidence pack auto-assembled
- • OQ qualifications enforced at dispatch, not paper
- • MAOP recalculations versioned + auditable
- • HCA exposure visible on the same map as integrity state
Days from close to operational control, not quarters
The M&A Integration Agent maps a target's SCADA, GIS, historian tags, and asset hierarchy into your Golden Record while the deal is closing. By go-live the dispatcher sees the acquired assets in the same map, the integrity engineer sees them in the same dig list, and the CFO sees the synergies in the same OPEX dashboard.
90 days from study-folder chaos to a live engineering loop
- WEEK 0Scope. Pick one corridor or one system. Define the success metric in the language of the regulator and the dispatcher.
- WEEKS 1–2Golden Record build. SCADA tap (read-only). Historian tag mapping. GIS reconciliation. Last-known ILI run loaded. Study folder versioned.
- WEEKS 3–4First agent live. Hydraulic Twin or Integrity Agent comes online. Engineer reviews and signs the first agent-prepared model run end-to-end.
- WEEKS 5–6Cycle-time measurement. Compare the new prep-to-export time against the Week-0 baseline. Authorise expansion to the next agent or next corridor.
- DAY 90Board readout. Cycle-time delta, integrity-risk delta, audit-readiness delta. Continued investment decision in 30 seconds.
Three forward paths
Take the Era 1–4 assessment to locate your operation. Read the Ultimate Guide for the architecture. Or scope a 6-week paid pilot directly.